For the implementation of the last tunnel segment of the Gotthart tunnel in switzerland, the CENERI tunnel, the subsection of the dewatering of the tunnel was assigend to the SIEMENS Mobility Switzerland.
We developed the "head server" on two locations (east and west portal of the tunnel) of the tunnel dewatering subsection, in a highly complex SCADA-Environment with highest sercurity standards.
the main tasks were
creating the internal database with all datapoints accordingly the S7-project file
observing all S7-400 redundant connection states
oberserving all drivers and controls of the system
creating the virtualisation corresponding the HMI styleguides and GUI-workshops
embedding the redundant "head server" into the tunnel main system via OPC UA
attending all official test phases through ATG (SBB subsidiary)